Edward Toran
Edward Toran has filed 6 building permits in Boston since 2018, closing 25% of 4 rated permits. 4 permits remain open. Primarily files building permits. 25.0 points below the city median of 50.0%.
25%
5
Construction Permits
6 total
4
Currently Open
4
Rate-Eligible
permits > 1yr old
2018–2026
Years Active
Closure rate based on permits older than 1 year. "Issued" and "Stop Work" statuses are excluded.
Performance by Permit Type
Building4 rated
25.0% closed vs 32% median, 6.5 points lower
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2026(YTD)
—
Open1
Closed0
Too early to rate — permits need 1 year to mature
2025
0.0%
Open1
Closed0
0 closed / 1 rated
2024
0.0%
Open1
Closed0
0 closed / 1 rated
2023
100.0%
Open0
Closed1
1 closed / 1 rated
2018
0.0%
Open1
Closed0
0 closed / 1 rated
All Permits
6 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | SF1819526 | Short Form Bldg Permit | 52 River ST, Boston | Apr 7, 2026<1yr | Oct 7, 2026 | $751,047.6 |
| Open | ALT1682470 | Long Form/Alteration Permit | 12 Lime ST, Boston | Mar 26, 2025 | Sep 26, 2025 | $837,000 |
| Open | SF1669776 | Short Form Bldg Permit | 12 Lime ST, Boston | Nov 14, 2024 | May 14, 2025 | $15,000 |
| Closed | SF1529060 | Short Form Bldg Permit | 49 Beacon ST, Boston | Oct 2, 2023 | Apr 2, 2024 | $52,000 |
| Open | SF1010081 | Short Form Bldg Permit | 25 Phillips ST, Boston | Jan 6, 2020 | Jul 6, 2020 | $78,000 |
| Open | ALT883350 | Long Form/Alteration Permit | 25 Phillips ST, Boston | Nov 27, 2018 | — | $103,995 |