33 T ST NE, Washington, DC, 20002
5 open permits
6 permits have been filed at 33 T ST NE since 2022. 5 remain open and 1 has been closed.
6
Total Permits
5
Open
1
Closed
Permit Type Breakdown
Building2 rated
0.0% closed vs 23% median, 22.6 points lower
Plumbing2 rated
50.0% closed vs 40% median, 10.1 points higher
Electrical1 rated
0.0% closed vs 32% median, 32.2 points lower
Mechanical1 rated
0.0% closed vs 43% median, 43.2 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
6 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | MECHANICAL | 33 T ST NE, Washington | Feb 6, 2023 | — | $101 | |
| Open | ELECTRICAL | 33 T ST NE, Washington | Nov 23, 2022 | — | $405 | |
| Open | PLUMBING AND GAS | 33 T ST NE, Washington | Nov 8, 2022 | — | $744 | |
| Open | ADDITION ALTERATION REPAIR | 33 T ST NE, Washington | Sep 28, 2022 | — | $5,889 | |
| Closed | PLUMBING AND GAS | 33 T ST NE, Washington | Jul 28, 2022 | — | $29 | |
| Open | BUILDING | 33 T ST NE, Washington | Jun 10, 2022 | — | $36 |