62 T ST NE, Washington, DC, 20002
6 open permits
9 permits have been filed at 62 T ST NE since 2020. 6 remain open and 3 have been closed.
9
Total Permits
6
Open
3
Closed
Permit Type Breakdown
Building4 rated
50.0% closed vs 23% median, 27.4 points higher
Electrical2 rated
50.0% closed vs 32% median, 17.9 points higher
Plumbing2 rated
0.0% closed vs 40% median, 39.8 points lower
Median based on all applicants with 20+ rated permits. Only permits older than 1 year are rated.
All Permits
9 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | ELECTRICAL | 62 T ST NE, Washington | Jun 4, 2026<1yr | — | $22 | |
| Closed | MISCELLANEOUS | 62 T ST NE, Washington | Mar 3, 2025 | — | $719 | |
| Open | PLUMBING AND GAS | 62 T ST NE, Washington | Aug 19, 2021 | — | $51 | |
| Closed | ELECTRICAL | 62 T ST NE, Washington | Aug 6, 2021 | — | $62 | |
| Open | PLUMBING AND GAS | 62 T ST NE, Washington | Aug 4, 2021 | — | $95 | |
| Closed | ALTERATION AND REPAIR | 62 T ST NE, Washington | Jul 26, 2021 | — | $2,329 | |
| Open | BUILDING | 62 T ST NE, Washington | Jul 16, 2021 | — | $36 | |
| Open | ELECTRICAL | 62 T ST NE, Washington | Nov 9, 2020 | — | $43 | |
| Open | MISCELLANEOUS | 62 T ST NE, Washington | Sep 17, 2020 | — | $810 |