Hugo Lombera Construction
Hugo Lombera Construction has filed 5 building permits in San Francisco since 2018, closing 100% of 1 rated permits. 3 permits remain open.
100%
5
Construction Permits
3
Currently Open
1
Rate-Eligible
permits > 1yr old
2018–2025
Years Active
Closure rate based on permits older than 1 year. “Issued” and “Stop Work” statuses are excluded.
Performance by Permit Type
Building1 rated
100.0% closed vs 76% median, 23.8 points higher
Median based on all applicants with 20+ rated permits in each category. Only permits older than 1 year are rated.
Year-by-Year Summary
2025
—
Open3
Closed1
Too early to rate — permits need 1 year to mature
2018
100.0%
Open0
Closed1
1 closed / 1 rated
All Permits
5 permits
| Status | Permit # | Address | Issued▼ | |||
|---|---|---|---|---|---|---|
| Open | PP20250917744 | Plumbing | 95 Corwin St, San Francisco | Sep 17, 2025<1yr | — | — |
| Open | E202509175696 | Electrical | 95 Corwin St, San Francisco | Sep 17, 2025<1yr | — | $0 |
| Closed | PP20250825335 | Plumbing | 95 Corwin St, San Francisco | Aug 25, 2025<1yr | — | — |
| Open | E202508255050 | Electrical | 95 Corwin St, San Francisco | Aug 25, 2025<1yr | — | $1 |
| Closed | 201808318863 | otc alterations permit | 465 Ellis St, San Francisco | Aug 31, 2018 | — | $30,000 |